WHA Industrial Estate Rayong – WHA IER

WHA Industrial Estate Rayong – WHA IER

Jointed operation with IEAT. Cluster Promotion with EEC & BOI Investment Program

Estate Specialty: Next-Generation Automotive, Automation & Robotics, Aviation & Logistics, Building Materials, Rubber, Plastic and Metals

WHA Industrial Estate Rayong or WHA IER is WHA’s latest development in the EEC in Ban Khai district of Rayong province and this industrial estate is ready to welcome investors since 2023.

The project comprises of 2,153 Rai (851 Acres or 344 Hectares). WHA IER is accessible from Highway 3574 and it is in proximity 25 km to Rayong City, 46 km to Map Ta Phut Deep Seaport, and 69 km to Laem Chabang Deep Seaport.

The stable power supply of 22 kV and 115 kV will be provided by Provincial Electricity Authority (PEA). The communication network with fiber optic will also be available in WHA IER by WHA Connect Co., Ltd.

Solar Rooftop, an alternative power source, as well as industrial water and wastewater treatment services will be managed by WHA Utilities and Power PLC.

Comprise an area of

2,153 Rai

(851 acres or 344 hectare)

Ready Build Factory For Rent

WHA Solar

WHA Solar offers clean solar energy to our customers with zero investment. Our solar solutions can be customized and installed to meet the specific needs of each customer's building, including options such as Solar Floating, Solar Farm, Solar Roof, and Solar Car Park. Solar energy is provided through a Power Purchase Agreement (PPA), eliminating the need for any initial investment.

Additionally, WHA Solar supplies solar power from our own reservoirs through Solar Floating to customers located near our reservoirs. For more information, please contact WHA Solar today at marketing@wha-group.com.

Infrastructure and Utilities



Wide Road in Good Condition

  • Primary Road
    30-35 meters width, 4 lanes reinforced concrete
  • Secondary Road
    25-30 meters width, 4 lanes reinforced concrete

Provided by PEA (Provincial Electricity Authority)

  • 22 kV
  • 115 kV

WHA Solar ​

WHA Solar offers clean solar energy to our customers with zero investment. Our solar solutions can be customized and installed to meet the specific needs of each customer's building, including options such as Solar Floating, Solar Farm, Solar Roof, and Solar Car Park. Solar energy is provided through a Power Purchase Agreement (PPA), eliminating the need for any initial investment. ​

Additionally, WHA Solar supplies solar power from our own reservoirs through Solar Floating to customers located near our reservoirs. For more information, please contact WHA Solar today at marketing@wha-group.com.​

Communication Network

Stable communication networks with fiber optic provide by WHA Connect Co., Ltd. Full range of fixed-line, mobile telephone and internet network.

Industrial Water

Standard Water Supply:

- 1-4 cu.m./rai/day on average

Water Treatment Plant Capacity:

- 2,050 cu.m./day at 1st Phase

- 8,200 cu.m./day

Wastewater Treatment

1st Phase of 2,600 cu.m/day (expandable to 5,200 cu.m/day in total)

Emergency Response

24/7 emergency service

Air Quality Monitoring Station

  • SO2, NO2, PM-10 Meteorological

Gallery


Our Customers

Bestrend New Material (Thailand) Co., Ltd.
Fucheng Technology (Thailand) Co., Ltd.
Winhere (Thailand) Co., Ltd.
MORE CUSTOMERS

Distance to WHA Industrial Estate

WHA Industrial Estate Rayong – WHA IER

Distance Point to Point Driving*
To Laem Chabang Deep Sea Port 53 Km. 69 Km.
To Map Ta Phut Deep Sea Port 35 Km. 46 Km.
To Si Racha 57 Km. 66 Km.
To Pattaya 50 Km. 75 Km.
To Rayong City 22 Km. 25 Km.
To Suvarnabhumi Airport 114 Km. 139 Km.
To Bangkok Central 134 Km. 158 Km.
To Ayutthaya 179 Km. 212 Km.
To Kabinburi 120 Km. 154 Km.
To Utapao Airport 42 Km. 53.6 Km.


*Using google map. Distance varies to route selection.

For more information about this location, or arrange a site visit, please fill in the form at Contact Us page

Contact Us