客户新闻

WHAUP Starts Commercial Operations of 19.44 MW Prinx Chengshan Solar Rooftop Project Phase 1; Signs 4.80 MW Phase 2 Contract

29/05/2023

Photo Caption: Ms. Jareeporn Jarukornsakul (Center Left), Chairman of the Executive Committee and Group CEO of WHA Corporation PCL, together with Mr. Somkiat Masunthasuwun (Left), CEO of WHA Utilities and Power PLC, and Mr. Zhang You Gan (Center right), Managing Director of Prinx Chengshan Tire (Thailand) Co., Ltd., together with Mr. Wang Bing (right),Vice Managing Director of Prinx Chengshan Tire (Thailand) Co., Ltd., a subsidiary of Chengshan Group from China, jointly signed a Power Purchase Agreement for Phase 2 of the company’s Solar Rooftop system, with a capacity of 4.80 MW. The new agreement was signed after the Solar Rooftop Project Phase 1, with a capacity of 19.44 MW, began commercial operations in May this year. The project’s success reinforces WHAUP as the operator of Thailand’s biggest Solar Rooftop Project with a combined capacity of 24.24 MW.

Established on December 20, 2018, Prinx Chengshan Tire (Thailand) Co., Ltd. is the first overseas production base of Prinx Chengshan Holding Co., Ltd., and is located at WHA Eastern Seaboard Industrial Estate 3, in the Eastern Economic Corridor (EEC).

Prinx Chengshan Tire (Thailand) Co., Ltd. is a modern tire factory, focusing on the R & D and manufacturing and sales of green, safe, high-quality and high-performance PCR tires and TBR tires. Currently, the annual capacity of PCR is 8 million PCS and TBR is 2 million PCS.